Text2Opt-Bench - Resource-Constrained Project Scheduling: leaderboard

Multi-mode resource-constrained project scheduling MILPs with time lags, budget and deadlines, from Text2Opt-Bench (Gao, Ge, Berenbeim, Bastian and Sala, 2026): the model reads the problem and its instance data in natural language and writes Gurobi code, and an answer counts when the solved objective matches the verified optimum. Pass@1 accuracy in percent on 50 problems; higher is better.

Metric: Pass@1 accuracy (%; multi-mode project scheduling MILP with time lags, budget and deadlines, 50 instances; solver-verified optimal objective). Source: arxiv.org. Saturation forecast: Estimated already saturated. 9 models tracked.

Top models

#ModelScoreOverall rank
1Claude Sonnet 4.6100#158
2Claude Opus 4.696#100
3GPT-588#163
4O4 Mini82#354
5DeepSeek V3.262#403
6DeepSeek R134#467
7GPT-5 Nano26#888
8Llama 3.3 70B Instruct0#1353
9Qwen 2.5 7B Instruct0#2583

No result here: #1 Claude Fable 5.2, #2 Gemini 4 Carbon, #5 Claude Opus 5.5.

Interactive version: theaggregate.ai/benchmark?slug=text2opt-bench-resource-constrained-project-scheduling · How It Works · Data refreshed daily, snapshot 2026-11-12.