Text2Opt-Bench - Resource-Constrained Project Scheduling: leaderboard

Metric: Pass@1 accuracy (%; multi-mode project scheduling MILP with time lags, budget and deadlines, 50 instances; solver-verified optimal objective). Source: arxiv.org. Saturation forecast: Estimated already saturated. 9 models tracked.

Top models

#ModelScore
1Claude Sonnet 4.6100
2Claude Opus 4.696
3GPT-588
4O4 Mini82
5DeepSeek V3.262
6DeepSeek R134
7GPT-5 Nano26
8Llama 3.3 70B Instruct0
9Qwen 2.5 7B Instruct0

Interactive version: theaggregate.ai/benchmark?slug=text2opt-bench-resource-constrained-project-scheduling · How It Works · Data refreshed daily, snapshot 2026-09-26.